Top Fence Supply TF-3220 Louvered Sliding Gate Installation Guide 1. Verify opening width, tail room, and path of travel. 2. Set support posts and hardware line within Top Fence tolerance. 3. Install gate frame and confirm smooth travel through full operation. 4. Coordinate latch position and any operator-ready brackets before turnover. 5. Confirm end stops and user safety provisions before handoff. Track, power, and operator installation require project-specific coordination where applicable.