Top Fence Supply TF-3200 Louvered Screen Fence Installation Guide 1. Confirm approved dimensions, post count, and finish before unloading. 2. Verify slab edge, grade line, and property line before setting posts. 3. Install posts plumb and to approved spacing. 4. Attach rails and louver infill in the approved installation sequence. 5. Check panel line, reveal consistency, and fastener concealment before turnover. Do not - Field cut structural members without written approval. - Change post spacing beyond the approved project layout. - Substitute hardware outside Top Fence approved list. Call for project review when actual site conditions differ from approved drawings.